Battle Ground High School gym's new floorLevy-funded maintenance projects preserve assets at Battle Ground schools

Maintenance crews worked hard over the summer making improvements and scheduled maintenance repairs at Battle Ground Public Schools all throughout the district. Below is a list of some of the more notable projects that were completed this summer, which are largely funded thanks to levy dollars:

Amboy Middle School

  • Repair floor cracks in the student wing (happening this month
  • Repaint the exterior

Battle Ground High School

  • Replace turf and track surfacing at district stadium
  • Repair and preserve asphalt/concrete areas
  • Bought an upgraded kiln that can be safely used inside for the ceramics department
  • Replace 6 restroom floors
  • Refurbished and painted floors and walls in the main gym

CASEE Campus

  • New HVAC system at CASEE C (home of the Tech Services department)

Laurin Middle School

  • Restroom additions and renovations

Lewisville Campus

  • Repair Nutrition Services roof
  • Repair A Building roof

Maple Grove K-8/River HomeLink

  • Repair and replace sidewalks
  • Replace flooring in the cafeteria
  • Revise outdoor air vents in modular building
  • Replace hallway flooring

Pleasant Valley Primary and Middle Schools

  • Widened the entry for 3 turn lanes in the parking lot

Prairie High School

  • Installed a scoreboard at the turf field
  • Replaced the bleachers in the 2 small gyms

GET IN TOUCH

icon 11104 N.E. 149th Street,
Brush Prairie, WA 98606

iconShipping & Receiving: All Locations
400 N. Parkway Ave. Battle Ground, WA 98604

iconMailing Address: P.O. Box 200
Battle Ground, WA 98604

icon360-885-5300

icon

iconFor Skyward help, please contact your child's school